Power Design Application
Engineer / Developer / Contractor / Owner:
Once we have received a completed power design application and the requested supporting documents, HL&P will send a design application invoice of $300.00. Once you pay the design invoice fee, your project will be placed in our design queue. A new power design application will need to be submitted for each individual phase of your project. **Your application will not be considered complete until all documents are submitted.
Please submit the following items at the bottom of the application using the “Upload .dwg, Upload .pdf, or Upload .zip” buttons.
Thanks, and we look forward to working with you on your project!
- Final site plan set, approved by the respective municipality (PDF) – Upload as either .pdf or zip file
- CAD file (.DWG) – Projected: Projected: NAD_1983_2011_StatePlane_Utah_Central_FIPS_4302_Ft_US – Upload as .dwg
- The CAD File needs to include the following at a minimum:
- Streetlights
- Public Utility Easements (PUE)
- Other Easements
- All utilities
- Lot lines
- Sidewalks or Trails
- Commercial Buildings: One-line diagram w/load calculations – Upload as .pdf
Thanks, and we look forward to working with you on your project!
Hint: To remove already selected files, select Choose Files again and hit Cancel.
Another Hint: If you need to upload multiple documents, you can select Choose Files, select multiple files and then hit Open.
Yet Another Hint: Files must be 20MB or smaller to submit with the online application.